PRODUCTS

INNOVATION,INTEGRITY,PRAGMATIC,EFFICIENT

PRODUCTS
CONTACT US

Company address: Hai Road, Xuzhou economic and Technological Development Zone No. 158(Lu Nan Xu Zhuang 323 highway service area)

Marketing Center: Xuzhou economic and Technological Development Zone, No. 5, No. 10 floor, No.

Beijing company: Beijing city Tongzhou District Street No. 10

英文

024-23609806 024-23609560

FAX:0516-87796101

Coal mining Machinery
Tunnel boring machine simulation operation test machine
2016-12-09
Order
Product model: HLJJ-101K-27
First, equipment overview
Simulation of roadheader practical training and operating skills assessment, according to the post skill operation evaluation standard and the evaluation procedure and within 10 minutes to finish all the exam process and can provides timely and transmit exam results include examination and operation error information.
By simulating the tunnel boring machine (prototype for EBZ - 160) working in the field of practical steps, procedures and methods, real-time assessment of trained personnel can complete the operation skills assessment tasks in accordance with the standard requirements.
System is mainly applied to the coal mine safety training institutions after the theoretical training and practical operation of the end of the mine to get evidence of coal mining machine drivers.
Two, software parameters
Check the contents, fully in accordance with the assessment of performance test standard of roadheader standard for evaluation of special operation personnel in coal mine development.
Succession (static) examination and preparation: this project assessment for students how to properly check roadheader operating environment conform to the safety requirements and safeguard measures is effective and reliable.
Dynamic inspection and test operation: the project is mainly to check the students' work before the operation of the dynamic inspection and test operation of the safety operation skills. Hands-on operation: before the start of the preparation work of the boring machine, speed up the start, the constant speed operation, slow crawl, normal parking, accident parking and other operational methods and procedures in line with the provisions of.
Boring machine operation: the project is mainly to assess the students' work on the operation of the dynamic inspection and test operation of the safety operation skills. Operation: the normal operation of the boring machine operation.
Boring machine stop operation: the project is mainly to check the normal operation procedures and the process of the accident.
Shift work: mainly examine the project work when the students shift work flow.
Three, hardware parameters
Host: Haier brand PC (the three year warranty)
Display system: 27 inch LED HD LCD
Seat: the seat cushion and the back sponge are made of vacuum foaming technology, and the surface material is black PVC. At the same time the seat with front and back, back angle adjustment and other functions.
Body structure: the body with 1.2 material of steel production, the overall use of electrostatic spray processing, to solve the problem, anti rust.
Power voltage: 220V national standard voltage, single power is less than 300W.

Copyright 2013 Xuzhou Hanlin Technology Co., Ltd. All Rights Reserved

Tel:400-0516-870 Fax:0516-87796101

Tec.Center:翰林科技

X

Order online

  • Products:
  • Quantity:
  • Name:
  • Address:
  • Tell:
  • Email:
  • QQ:
  • Remark:
  • Codes: Verification Code
  •